Record timber stacks

Record where timber is stacked, with product, species, estimated volume, tonnes, pieces and length, so forwarding and collection know where to go.

  1. Go to Jobs and tap Timber stacks.
  2. Tap New timber stack.
  3. Enter the Product, Species, Est. m³, Est. tonnes, Pieces and Length m (all optional).
  4. Under Where is the stack?, choose At my GPS position or Choose on the map.
  5. Tap Save.

Stacks show on the map as a brown square with a T. Once a stack is collected, change its status and it's hidden from the map.

Volumes and tonnages are estimates entered by hand.

Still stuck? Contact us and say what you were trying to do.